Welcome to Pyramid Automation - Prosperity Through Technology

Call us 9:00am - 5:30pm

+92-42-357 609 10

E-mail us

info@pyramidautomation.com

Welcome to Pyramid Automation

Pyramid Automation has offered innovative technology products and services in Pakistan since 2003

Our business philosophy is to combine advanced engineering with superior products, systems integration capability with a deep understanding of the customer’s needs to create unique solutions.


PA continues to expand into new markets, invest in technology, technical talent and state-of-the-art equipment in order to better serve our growing customer base.


Industries, the countries they reside in, and the economies of those countries are interlinked in a complex web of interdependence.

Learn about the services

Global Partners

You will find yourself working in a true partnership that results in an incredible
experience, and an end product that is the best.

Deep Sea Electronics ISKRA Fozmula Carlo Gavazi Stego Raycap Airsys Blank Truemeter

Creative Solutions

We Offer DSE Load Share Management Solutions.

SCADA/IOT Devices Remote Monitoring and Control.
Power Quality Analysis and Power Management Systems.

24/7 Support

Need Technical Support?

Please Don't Hesitate To Reach Out To Our Support Team. 

KEY CUSTOMERS

Learn more from our FAQs

You will find yourself working in a true partnership that results in an incredible experience, and an end product that is the best.

How to claim warranty?

We offer standard warranty terms and conditions. 
Warranty can be claimed by contacting our Sales Department.
For further information kindly visit our warranty services page.

What is Power Management System?

Power Management System will help you to monitor and control the load on your sources which enables us to control the cost of operations and quality of Power been utilized.

Can I use DSE chargers to supply a standing panel load?

Yes. DSE chargers can be used as power supplies or as a PSU to supply a standing load.

Does my DSE battery charger need to be disconnected when the engine is running?

No, DSE battery chargers can be left connected during cranking and while the engine is running.

Is it possible to install DSE battery chargers in series to achieve a higher voltage or in parallel to achieve a higher current output?

Yes. DSE battery charger outputs can be connected in parallel for a higher current rating or in series for a higher voltage rating.

What size charger should I use for a battery that regularly discharges to a low level?

This usually means you require a fast recharge time. Use a larger charger, with a current rating 10% of the Ah capacity of the battery. For example, for a 100 Ah battery, use a charger up to 10 A. If you want to charge at a rate more than this, check first with your battery manufacturer.

What size charger should I use for a battery that is used as a starter battery on a generator?

First consider the panel load on the battery. This is the main requirement for the charge current. The battery charger must be able to supply this current. Any remaining capacity in the charger is used to charge the battery. Battery charging only needs to be a small amount above this to keep the battery "topped up”. Bulk charging after an engine start is performed by the DC Charging Alternator. For example, for a standing load (panel load) of 2 A, a 5 A or 10 A charger is usually considered satisfactory for the majority of genset applications.

What types of batteries are compatible with DSE Battery Chargers?

DSE Battery Chargers have a configurable charging voltage suitable for most battery types (ie NiCd, Lead Acid, Gel type etc). For the "Intelligent” chargers, this voltage is PC configurable by the user. Contact DSE Technical Support for more information.

How can I prevent Fail to Stop on the DSE ATS controller when the generator is run from its local controls?

DSE334 and DSE335 have the option to disable the Fail to Stop detection using the DSE Configuration Suite PC Software.

Which ATS controller is most suited for a system with two mains supplies to select one available supply from two?

DSE334 and DSE335 are designed specifically to support this application.

My cooling timer has expired but my engine is still running. What should I do?

Check the cooling timer in the Genset controller is suitable for the application.

Do I need to fit breaker auxiliary contacts to my DSE ATS Controller?

The installation of auxiliary contacts is optional with the DSE 33X range of controllers. If the contactor auxiliary contacts are not fitted to the modules inputs, the on load indication lamps will follow whichever load contactor is closed

Where can I find the DSE Configuration Suite Software and supporting documentation for my DSE product?

Visit the product page for the device on our website and select SOFTWARE. All information and PC software for the device is listed here.

Can I run the DSE Configuration Suite Software on Windows 10?

The DSE Configuration Suite software is compatible and designed to work with Windows 10

Request a Quote

Fill all information details to consult with us to get sevices from us

Get in touch

Feel free to get in touch with us.
Always open to discuss new projects

Call us on

+92-42-357 609 10

Email us

info@pyramidautomation.com